News
News
Accelerator Report: HiLumi LHC beam reliability runs pave the way to the future
Dedicated HiLumi LHC beam test runs are currently taking place in the LHC injectors – a crucial step to guarantee that the HiLumi LHC can operate at peak performance from the very start of physics running, in 2030
Accelerator Report: The 2026 run will be short but intense
Every day counts, so the LHC operations teams have mapped out a precise sequence of running phases to maximise the physics output during the machine’s final months
Crystal shadowing to reduce beam losses
A new system made of precisely aligned thin, bent crystal arrays will greatly improve particle beams sent to fixed-target experiments in CERN’s North Area, while also protecting sensitive equipment
Final laps at the LHC
The final physics season at the LHC has just kicked off! The experiments will record collisions until the end of June, when work will begin on transforming the machine into a high-luminosity accelerator.
HiLumi LHC: cryogenics equipment arrives underground
Two cold boxes have been transported down into the service tunnels of the future accelerator
Accelerator Report: Protons are heading towards the LHC
Many activities are currently progressing across the accelerator chain as the complex moves steadily towards full operation
HiLumi LHC: full-scale tests start
Scientists at CERN have triggered the complex cooldown of a 95-m-long test stand that reproduces the underground configuration of innovative technologies for the Large Hadron Collider’s high-luminosity upgrade
Accelerator Report: The accelerator complex is gradually waking up from the winter shutdown
Beam commissioning is progressing well in CERN’s accelerator complex, with beams already at the gates of the SPS
Accelerator Report: Run 3 operations counting down to LS3
Linac4 and the PS Booster have already completed their standalone beam commissioning successfully and have handed over the baton to the PS