Tag: CERN community
-
Antiprotons to test the Standard Model
The PAX experiment, the first user of the antimatter factory’s new test beamline, is studying quantum electrodynamics using atoms containing an antiproton
-
An antimatter beam open for booking
Need an antiproton beam? TELMAX, the new test beamline at CERN’s antimatter factory, is now open for booking
-
Accelerator Report: LHC on track despite disruptions throughout the accelerator complex
Following the achievement of 2460-bunch stable beams on 24 May, the accelerator complex experienced an SPS magnet failure, a central timing glitch and a complex-wide power disruption. Yet the LHC remains on track to achieve its 2025 luminosity goal
-
CERN sets new environmental objectives for 2030
To mark World Environment Day on 5 June, CERN has released its new environmental objectives for 2030, which emphasise its ongoing commitment to environmentally responsible and sustainable research
-
Computer Security: 5 ways to remotely connect to CERN
With the roll-out of 2-factor authentication for the CERN Single Sign-On now concluded, the next step required by the 2023 CERN cybersecurity audit is to streamline all methods for remotely connecting to CERN
-
ALICE eyes the cosmos
New data from the ALICE experiment, collected when no particle beams were circulating in the LHC during pauses in Run 2, may contribute to solving a puzzle surrounding cosmic muons
-
2024 Annual Report – Chapter VI of the Staff Rules and Regulations
Settlement of disputes and discipline
-
CERN and the 2025 Eurovision Song Contest
In case you missed it, CERN featured in this year’s Eurovision Song Contest
-
CERN’s great outdoors
Inspired by urban design initiatives around the world, the “Outdoor Spots” project is transforming underused areas at CERN into perfect locations for picnics and walks
-
Accelerator Report: The LHC reached 1200 bunches per beam – full intensity is in sight!
On 19 May, the LHC reached 1200 bunches per beam, a level that is considered meaningful for physics. The full intensity of 2460 bunches per beam could be achieved before the end of the week








