Tag: Proton Synchrotron
-

Accelerator Report: Final countdown – CERN’s injector complex enters its last stretch before LS3
The LHC has already fallen silent for Long Shutdown 3 (LS3), but elsewhere across CERN’s accelerator complex the pace remains intense. With just a week and a half of beam operation remaining, the countdown has begun for all the machines, which will switch off their beams at 6.00 a.m. on Monday, 31 August, marking the
-

Accelerator Report: An important upgrade to the PS radiofrequency system and a heavy ion run in full swing
In a particle accelerator, radiofrequency (RF) systems are among the crucial components that make beam production possible. While magnets guide the particles around the ring, RF systems provide the beam with its longitudinal structure: they accelerate it, keep it captured in bunches, shape it, split it, rotate it and ensure synchronisation for transfer to the







