Accelerator Report: Good performance for some, swift recovery for others
The LHC pre-injectors delivered excellent availability throughout recent weeks, while an SPS electrical fault and an LHC collimator vacuum leak have been overcome, allowing a successful return to full luminosity production
Accelerator Report: The accelerator complex, between precision repairs and future-facing studies
The past weeks brought a mix of hands-on interventions and forward-looking studies across the CERN accelerator complex, while the LHC continued to catch up with the forecast luminosity curve
Although the much-appreciated winter break is well behind us and most of us are back at work, the accelerator complex is still in hibernation – but not for much longer
The LHC injector chain has been switched to a new beam production scheme to explore its potential to produce more collisions in the LHC and to compare its performance to that of the standard LHC beam