Tag: luminosity
Luminosity is an important indicator of the performance of an accelerator: it is proportional to the number of collisions that occur in a given amount of time. The higher the luminosity, the more data the experiments can gather to allow them to observe rare processes.
-
Accelerator Report: Target reached, but compressor off
On 23 September, the LHC reached its 2024 target for integrated luminosity. And then a cryogenic station broke down…
-
Accelerator Report: Preparing the LHC and its injector complex for the 2024 lead-ion run
The physics run for the SPS North Area will start on 4 November, followed by the LHC lead-ion physics run on 6 November, and the PS East Area on 11 November
-
Accelerator Report: LHC Run 3 achieves record-breaking integrated luminosity
On Sunday, 1 September, the LHC integrated luminosity for Run 3 (2022–2025) equalled that of Run 2 (2015–2018)
-
Accelerator Report: No summer holidays for the accelerator complex
CERN’s accelerators show very good availability rates: beams are in place
-
Accelerator Report: Technical stops always hold a few surprises
Restarting the entire accelerator complex after a technical stop is rarely seamless and often comes with unexpected technical challenges
-
Accelerator Report: Setting the stage for a productive summer
We are optimistic that we will have a successful luminosity production period this summer
-
Accelerator Report: Already a fifth of the way there
The LHC is performing well and the injector complex is treating its experimental users to a high level of beam availability
-
Accelerator Report: Keeping cool and adapting to challenges
In the last two weeks, the LHC teams have encountered two main challenges that have led to some changes to the filling scheme
-
Accelerator Report: Reviving antimatter physics and fine-tuning luminosity measurements in the LHC
On Friday, 30 June, an exciting milestone was reached: the much-awaited antiproton physics season finally commenced
-
Accelerator Report: Overcoming setbacks, antiprotons return as LHC recovers luminescent brilliance
The AD operations team received on Friday, 1 June – 12 days earlier than rescheduled – the green light from the AD injection kicker expert: beam could be injected again in the AD ring








