Scientists at CERN have triggered the complex cooldown of a 95-m-long test stand that reproduces the underground configuration of innovative technologies for the Large Hadron Collider’s high-luminosity upgrade
Accelerator Report: A very busy technical stop ahead of Long Shutdown 3
This technical stop is particularly intense, being both shorter than usual, to maximise the limited time for physics, and very busy, to make essential preparations for LS3, which begins in June
Accelerator Report: A strong finish and a swift transition into the winter break
The 2025 run was successfully completed on 8 December at 6.00 a.m., signalling the start of the year-end technical stop for the LHC and the injector complex
Another year of outstanding accelerator complex performance
The extraordinary performance reflects decades of accumulated expertise, a culture of continuous development and improvement, and a sustained collective effort across all technical and operational domains