News
News
LS1 report: successful tests
New beam dump and shielding blocks installed at the PS Booster
LS1 report: Replacing an antique
At the PS, replacement of the old cooling and ventilation system, which dated back to 1957, is progressing well
A new beam dump for the Proton Synchrotron Booster
Watch CERN engineers install a new beam dump at the Proton Synchrotron Booster
Autumn issue of Accelerating News available
Issue 7 of Accelerating News, a quarterly publication for the accelerator community, is now available
Explore CERN with Google Street View
CERN and Google have joined forces to create panoramic virtual tours of the CERN site
LS1 report: Shielding operations
At the LHC, the SMACC project’s consolidation train has just entered Sector 7-8, the third sector to be consolidated
The LHC’s first long run
Following the first 3.5 TeV collisions in March 2010, the LHC had three years of improving integrated luminosity
Japanese candidate site selected for linear collider
A site evaluation committee has recommended a location for the proposed International Linear Collider, if it is built in Japan
LS1 report: Cryogenic line goes through scanner
This week, teams have started X-raying the cryogenic line to examine its condition in detail
LS1 report: First missions accomplished
Things are going well in all the laboratory’s accelerators