At CERN, we probe the fundamental structure of particles that make up everything around us. We do so using the world's largest and most complex scientific instruments.
Know more
Who we are
Our Mission
Our Governance
Our Member States
Our History
Our People
What we do
Fundamental research
Contribute to society
Environmentally responsible research
Bring nations together
Inspire and educate
Fast facts and FAQs
Key Achievements
Key achievements submenu
The Higgs Boson
The W boson
The Z boson
The Large Hadron Collider
The Birth of the web
Antimatter
News
Accelerators
At CERN
Computing
Engineering
Experiments
Knowledge sharing
Physics
Events
CERN Community
News and announcements
Official communications
Scientists
Press Room
Press Room submenu
Media News
Resources
Contact
The research programme at CERN covers topics from kaons to cosmic rays, and from the Standard Model to supersymmetry
Dark matter
The early universe
The Higgs boson
The Standard Model
+ More
CERN's accelerators
The Antiproton Decelerator
High-Luminosity LHC
Accelerating: radiofrequency cavities
Steering and focusing: magnets and superconductivity
Circulating: ultra-high vacuum
Cooling: cryogenic systems
Powering: energy at CERN
The CERN Data Centre
The Worldwide LHC Computing Grid
CERN openlab
Open source for open science
The birth of the web
ALICE
ATLAS
CMS
LHCb
By Topic
By format
360 image
Annual report
Brochure
Bulletin
Courier
Image
Video
By audience
CERN community
Educators
General public
Industry
Media
Students
The PS Booster successfully received its first beams from Linac4 in December. The PSB team is now preparing the machine for acceleration
The upgraded Muon Forward Tracker, one of ALICE’s main subdetectors, was installed in the cavern in December
COVID-19 has undoubtedly had an impact on the activities and schedule of LS2. Nevertheless, the accelerators are now starting up again
After the PS, it is now time for the SPS to return to the Operations group’s hands. Beam commissioning in the accelerator is scheduled for 12 April 2021
The schedule for the current long shutdown (LS2) has had to be modified due to the COVID-19 pandemic
Sector 4-5 of the LHC has now been cooled with superfluid helium to a temperature of 1.9 K (−271.3 °C)
Linac3 is already producing lead-ion beams to test some crucial new equipment that could significantly increase beam intensity and quality
Upgrades and repairs of the HIE-ISOLDE linear accelerator will enable experiments to delve deeper than ever into the physics of radioactive isotopes
The final pressure test in the LHC took place in sector 6-7 on 27 October. The pressure tests are the last step before the cooling of each sector
On 23 October, the PS returned to the Operations group’s hands. Beam commissioning in the accelerator is scheduled for 1 March 2021